The challenge was big. Demolishing a vacant building without damaging the two adjoining buildings. But there was nothing the UNIC URW 506 mini crane couldn't handle calmly and safely.
The construction industry has difficult challenges, but not impossible ones. This time the aim was to demolish before building. A vacant building in Oporto is going to make way for new construction, but the buildings next to it must be preserved.
The UNIC URW 506 mini spider crane came into play because it is small in size but large in capacity (3T) and reach (16m). Once inside, the equipment was able to remove all the stone, concrete and wood that was still inside the space.